Telangana Govt Roads  And Buildings Department of Department Wanaparirthi Division  staff Details & Works of works Progress Report report ((GOVERNMENT OF TELANGANANA ROADS & BUILDINGS DEPARTMENT)

Sl.No Circle    District Division Officer Desigination Division Mobile No
1 Wanaparthy Wanaparthy Wanaparthy Smt B.Parimila Executive Engineer, R&B Division, Wanaparthy 9440818101
2 Wanaparthy Wanaparthy Wanaparthy Shri B. Babu Deputy Executive Engineer Building Sub Division, Wanaparthy 90009869899
3 Wanaparthy Wanaparthy Wanaparthy Shri R. Vishnu Teja Deputy Executive Engineer Sub Division, Wanaparthy 9440818448
4 Wanaparthy Wanaparthy Wanaparthy Shri P. Hanuman Assistant Executive Engineer Sub Division, Wanaparthy 9640085212
5 Wanaparthy Wanaparthy Wanaparthy Shri B. Rakesh Assistant Executive Engineer Sub Division, Pebbair 9177950675
6 Wanaparthy Wanaparthy Wanaparthy Shri B.n. Raju Kumar Assistant Engineer Sub Division, Pebbair 9705359173

 

1. Classification wise details of roads
District State Highways Major District Highways Rural roads Length of total roads
Wanaparthy 18.000 k.m 306.096 k.m 201.540 k.m 525.636 k.m

 

2.Surface wise details of roads
District CC roads BT Roads w.b.m. Roads Soil roads Length of total roads
Wanaparthy 26.682 k.m 494.254 k.m 4.700 k.m 0.000 k.m 525.636 k.m

Wanaparirthi Division — Road Works of works Progress Report report (PROGRESS REPORT)

 

Sequence No

 

Gs / Divisions

 

Constituency 

 

Work Details (Name of Work)

Scheme  & year of year 

AS / rAS Northern No. No

((AS / RAS Ref.)

Grant of grant Total total

(Rs. Lakh one lakhs)

 

Sanctioned length

 

Poorerthina length

Work work Current  Phase stage / Progress (Present Stage / Progress)

1. Ps S Works (PLAN WORKS)

1 Wanaparthy Wanaparthy Km on Balijapally branch road in Wanaparthi district.your. 2/8-10 At H.l.b. Construction (4V x 10.00 Span of meters). MDR PLAN

GO Rt.No388 T ((R&B() (R- –

II) Det dt11.08.2023

350.00 HLB – – Agreement completed. Work work To be started.
2 Wanaparthy Wanaparthy Nagar Kurnool – Km on Gopalpet Road through Revalli.your. 29/4-6 At H.l.b. Construction (7V x 10.00 Span of meters). MDR PLAN

GO Rt.No388 T ((R&B() (R- –

II) Det dt11.08.2023

455.00 HLB – – Agreement completed. Work has to start.
3 Wanaparthy Wanaparthy Peddamandadi – NH-7 Km on the road.your. 7/2-4 At H.l.b. Construction (2V x 8.00 Span of meters). MDR PLAN

GO Rt.No388 T ((R&B() (R- –

II) Det dt11.08.2023

200.00 HLB – – Agreement completed. Work has to start.
4 Wanaparthy Wanaparthy Peddamandadi – NH-7 Km on the road.your. 1/0-2 At H.l.b. Construction (4V x 10.00 Span of meters). MDR PLAN

GO Rt.No388 T ((R&B() (R- –

II) Det dt11.08.2023

300.00 HLB – – Agreement completed. Work has to start.
5 Wanaparthy Wanaparthy Wanaparthy – Atmakur Road and Wanaparthy – Connecting Kolhapur Road to K.your. 0/0 from from from from from 8/8 Construction of bypass road up to MDR PLAN

GO Rt.No366 T R&B ((R- -II)

Det dt.03.10.2022

7300.00 8.80 Km – – Work has to start. Proposals for forest permit are submitted in the Parivesh portal.
6 Wanaparthy Wanaparthy Pebbair – K.m on Yacharla Road.your. 1/8-10 At H.l.b. Construction (10V x 10.00 Span of meters). MDR PLAN

GO Rt.No388 T ((R&B() (R- –

II) Det dt11.08.2023

800.00 HLB HLB 10 spans 7 Spans are complete. The work was stopped due to pending payment of funds.
7 Wanaparthy Wanaparthy Package package–2: Wanaparthy – Buddha, Wanaparthy – Kolhapur and Wanaparthy – Expansion of Pebbair roads 4-Development as a lane and on the Nallacheruvu stream 4-Lane H.l.b. construction. MDR PLAN

G.O.Rt.No560 T((R&B() (R- –

II) Det Dt.08.12.2020

2270.00 3.10 Km 1.40 Km BT road and DBM works were done. The process of removal of encroachments by municipal authorities is in progress.
8 Wanaparthy Wanaparthy Big man – NH-7 Km on the road.your. 1/4-6 At H.l.b. Construction (4V x 10.00 Span of meters). MDR PLAN

GO Rt.No388 T ((R&B() (R- –

II) Det dt11.08.2023

300.00 HLB HLB The entire bridge construction has been completed. Approach road works are to be done.
9 Wanaparthy Wanaparthy Big man – NH-7 Km on the road.your. 3/0-2 At H.l.b. Construction (3V x 10.00 Span of meters). MDR PLAN

GO Rt.No388 T ((R&B() (R- –

II) Det dt11.08.2023

200.00 HLB HLB The entire bridge construction has been completed. Approach road works are to be done.
10 Wanaparthy Wanaparthy Pebberu – K. on Yacharla Road.your. 4/0-2 At H.l.b. Construction (5V x 10.00 Span of meters). MDR PLAN

GO Rt.No388 T ((R&B() (R- –

II) Det dt11.08.2023

400.00 HLB HLB The entire bridge construction has been completed. Approach road works are in progress.
11 Wanaparthy Kollapur Wanaparthy – Km on Kolhapur Road.your. 22/500 from from from from from 23/100 Expansion and strengthening up to. MDR PLAN

GO Rt.No130 T ((R&B)

Det dt27.11.2014

199.00 0.60 Km 0 Km CC road work is completed. 400 in meters 350 The meter drain work is complete. The rest of the work is in progress.
12 Wanaparthy Wanaparthy Package package–1: Vanaparthi – Jadcharla Road to K.your. 0/0 from from from from from 3/0 up to until up to 4-Expanding into the lane and Jerripotulavagu, On ropes 4-Lane H.l.b. construction. MDR PLAN

G.O.Rt.No560 T ((R&B() (R- –

II) Det Dt.08.12.2020

2700.00 3.00 Km 2.95 Km 2.95 ki.your. DBM work is complete. 7 Box culverts and two H.l.b. Bridges completed. The process of removal of encroachments on the temple side is in progress.
13 Wanaparthy Wanaparthy Nagar Kurnool – Gopalpet, By Revalli, Km the road.your. 0/0 from from from from from 36/4 Extending from single lane to double lane. MDR PLAN G.O.Rt.No130 T ((R&B() (R.II) Det Dt27.11.2014 4914.00 30.95 Km 30.95 Km The work is completely done.
14 Wanaparthy Wanaparthy Km on Balijapally branch road.your. 1/8-10 At H.l.b. Construction (3V x 10.00 Span of meters). MDR PLAN

GO Rt.No388 T ((R&B() (R- –

II) Det dt11.08.2023

300.00 HLB HLB

The work is completely done.

 

 

2. Non-plan works

15 Wanaparthy Devarakadra Pamapur, By Ramakrishnapur and Achupur NH-7 From Natavelli on the road.your. 14/0 from from from from from 15/8 Renewal works up to. MDR NON PLAN Memo No /DCE/EE- -CRN/ DEE8/AEE6/2025 Dt 10.09.2025 97.00 1.80 Km 0 Km Work has to start.
16 Wanaparthy Wanaparthy Km on Nagpur Loop Road.your. 1/0 from from from from from 1/6 Periodic renewals up to MDR NON PLAN Memo No /DCE/EE- -CRN/ DEE8/AEE6/2025 Dt 11.09.2025 95.00 0.60 Km 0.60 Km The work is done.
17 Wanaparthy Wanaparthy Km on Elkicherla road from Ghanpur.your. 0/0 from from from from from 6/0 Periodic renewals up to MDR NON PLAN   281.00 6.00 Km 0.60 Km 8 Numbers CD works and protection wall completed. ki.your. 5/4 from from from from from 6/0 BC road completed till

 

18 Wanaparthy Wanaparthy Km on Elkicherla road from Ghanpur.your. 7/2-4 At H.l.b. Flood damage recovery (rehabilitation (FDR) Construction. MDR NON PLAN Memo No. 60/E- -in- -C((SR&CRN)/SE- -II/2023-24 Dt.06.10.2023 255.00 HLB HLB The entire bridge construction has been completed. Approach road works are to be done.

3. Special Development Funds ((SDF) Works

 

19

 

Wanaparthy Kollapur PWD From Pentlavelli Cross Road to Srirangapur, By Kundur and Tamamukunta, Road widening and strengthening. SDF Dist. Collector WNP Pro.No.76/SDF/WNP/ 2022-23 Dt30.12.2022 500.00 2.08 Km 1.53 Km CC road has been completed in Tamamukunta village part. ki.your. 22/650 from from from from from 23/750 up to until up to M-40 The work is done. The rest of the work is in progress.

4.Progress report of building construction works

 

sequence sequence No. No

 

G s / DivisionS

 

Constituency Constituency

 Work work Details ((Name of Work)

AS / rAS Northern No. No

((AS / RAS Ref.)

Work work Current current current Phase stage / Progress ((Present Stage / Progress)
1 Wanaparthy Wanaparthy In Wanaparthy District under Judicial Construction Scheme 10+2 Construction of court complex, Including Family Court and POCSO Court. Rs.8,100.00 lakhs.
G.O.Rt.No.597, Law Department, Law Date: 14.11.2024.
The stilt/ground floor roof slab is complete with expansion joints in the left and right parts of the concrete. The roof slab work is to be started for the middle part. The construction of the pillars on the left side of the first floor has been completed, Slab shuttering works are in progress. Pillar concrete work is going on on the right side of the first floor.
2 Wanaparthy Wanaparthy New Government Medical College (Phase-Fage- at Wanaparthy District CentreII) Building construction. Rs.18,400.00 lakhs.
G.O.Ms.No.92, Health, Medical Department, Medical Date: 22.06.2021.
All the construction works are completely completed. The constructed medical college building was handed over to the management of Vanaparthi Government Medical College.
3 Wanaparthy Wanaparthy

1.Construction of Integrated District Office Complex and Officers Residential Houses.

2.Integrated District Office Complex (IDOC).

3. Collector’s Residence House.

4.Residence of Joint Collector.

5.d.r.o. residence.

6.Residential houses of district level officers – 8 numbers.

Rs.5,970.00 lakhs.
G.O.Rt.No.245, T(R&B) R-II Department, T Date: 01.05.2017.
The construction of the building complex and residential houses is completely completed. The final bill submission process is in progress.
4 Wanaparthy Wanaparthy In Wanaparthy town 4 Suits R&B Inspection Bungalow Construction. Rs.145.00 lakhs.
G.O.Rt.No.157, T(R&B) B-1 Department, T Date: 04.06.2008.
All the construction works of the inspection bungalow have been completed. Final Bill PAO Pending in office.